Call us on 01202 764 551 webenquiries@greendaleconstruction.com
Value: £173,000
Client: Poole Borough Council
Duration: 6 weeks

Project Description:

The beach hut refurbishments on Sandbanks are one of Greendale’s most coastal projects ever undertaken. What was considered to be the optimum time of year to undertake a full refurbishment of two blocks, the team were faced with un-spring like weather with torrential rain and gale force winds.

Presented with an immovable deadline by the council, Greendale’s Small Works division was undeterred by adverse weather conditions; focused on the quality and deliverability as desired by the client. The team were supplied with all of the relevant tools and health & safety supervision to make sure that the programme was not delayed, nor did if fall over budget.

The team achieved a successful refurbishment of the coastal beach huts. Gratefully received by the client, the beach huts were ready and open to be used in time for the 2018 summer season.

 

Architect: Borough of Poole
Surveyors: Borough of Poole

01202 764 551 Email us